Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

The first three tasks for installing and operating the Sangoma SBC are

  • Unpack

  • Inspect

  • Power up.

 

Carefully inspect the Sangoma SBC Appliance for any damage that might have occurred in shipment.

If damage is suspected, file a claim immediately with the carrier, keep the original packaging for damage verification and/or returning the unit, and contact Sangoma Customer Service.

What is included in the box

  • Sangoma SBC Appliance

    • Appliancecan be 1U or 2U depending on model ordered

  • Power Cable

    • AC cable in case of AC PSU (black cable)

    • DC cable in case of DC PSU (RED & Black cable)

  • Mounting Brackets

  • Rack mount rails

  • Quickstart user guide

Factory Configuration

  • No labels